Times Network New Zealand
  • Home
  • Local News
  • World
  • Business
  • Lifetyle
  • Entertainment
  • Technology
  • Travel
  • Food
  • Editor’s Choice
  • Press Release
What's On
Mercosur: How Macron’s domestic weakness undercut his Brussels clout

Mercosur: How Macron’s domestic weakness undercut his Brussels clout

January 10, 2026
As Bulgaria joins the euro, how do the other 20 member states see the currency?

As Bulgaria joins the euro, how do the other 20 member states see the currency?

January 10, 2026
Repair and reuse: inside Europe’s refurbished tech market

Repair and reuse: inside Europe’s refurbished tech market

January 10, 2026
EU rejects violence against protesters in Iran, backs ‘legitimate aspiration’ for change

EU rejects violence against protesters in Iran, backs ‘legitimate aspiration’ for change

January 10, 2026
EU member states back Mercosur deal, French MEPs vow fight in Parliament

EU member states back Mercosur deal, French MEPs vow fight in Parliament

January 10, 2026
Facebook X (Twitter) Instagram
Web Stories
Facebook X (Twitter) Instagram
Times Network New Zealand
Subscribe
  • Home
  • Local News
  • World
  • Business
  • Lifetyle
  • Entertainment
  • Technology
  • Travel
  • Food
  • Editor’s Choice
  • Press Release
Times Network New Zealand
Home » State Highway 2 to be raised 1.8m for flood protection
Local News

State Highway 2 to be raised 1.8m for flood protection

By Press RoomNovember 11, 20253 Mins Read
State Highway 2 to be raised 1.8m for flood protection
Share
Facebook Twitter LinkedIn Pinterest Email
State Highway 2 to be raised 1.8m for flood protection

Flood protection work in a cyclone-hit coastal Hawke’s Bay community is finally underway, with vegetation cleared in preparation for the first stage of a $22 million project along State Highway 2.

The project at Whirinaki includes raising and strengthening stopbanks, as well as elevating a section of the highway to improve flood resilience.

Earlier this year, the plan was in doubt after the Hawke’s Bay Regional Council revealed it was facing a funding shortfall.

However, following a design change, the Government contributed an additional $9 million, bringing its total to $17.3m, while the regional council contributed a further $3m, raising its total to $5.75m.

The key part of the project is raising a 440m section of State Highway 2 to link with the stopbanks.

The work involves first building a sealed, two-way diversion road, allowing for the road-raising tranche of work to begin in January 2026.

Regional council chair Sophie Siers said seeing machinery on site was an exciting milestone and an important step forward for the Whirinaki community, who had faced uncertainty since Cyclone Gabrielle.

“The construction of the diversion road was significant as we could all see work starting and it would give residents the confidence that better flood protection was on the way.”

HBRC project manager Luke Cahalin said the bypass was near the Contact Energy generation site and Pan Pac seed orchard.

“We are working closely with NZTA. We will be raising part of State Highway 2 by up to 1.8m at its apex to integrate with the stopbanks, so it is a significant piece of work. We are also working with NZTA to ensure there is as little disruption to traffic as possible.”

A regional council spokesperson said, all going well, the plan was to have the road completed by the end of March.

“The diversion road material would then be stripped and recycled as roading material for the Contact Energy and Transpower entranceway.

“There would be some minor stop/go traffic management at each end of the diversion road, where it ties into the existing State Highway, but the majority of the bypass road would be constructed off-line and would have minimal impact on commuters. The road will be two-way and sealed,” the spokesperson said.

Former regional councillor Martin Williams said earlier this year the project was “mission-critical”, not just for the Whirinaki communities it would better protect, but for the Hawke’s Bay economy.

“The Pan Pac pulp mill, one of the region’s biggest employers, was severely impacted by Cyclone Gabrielle. With rising electricity and insurance costs and a highly volatile export market, I doubt the mill would survive another cyclone without this stopbank project. Simply put, this project is in the ‘too-important-to-fail’ category,” Williams said.

– LDR is local body journalism co-funded by RNZ and NZ On Air.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Australian social media ban: What you need to know

Australian social media ban: What you need to know

The OCR is down, so why are home loan rates rising?

The OCR is down, so why are home loan rates rising?

Speed, alcohol and inexperience factors in Nelson teen’s fatal crash

Speed, alcohol and inexperience factors in Nelson teen’s fatal crash

Mt Eden prisoner dies 11 days after attack, homicide probe launched

Mt Eden prisoner dies 11 days after attack, homicide probe launched

News in 90 Seconds December 10

News in 90 Seconds December 10

Auckland Transport says bus stabbing attacks ‘deeply concerning’

Auckland Transport says bus stabbing attacks ‘deeply concerning’

Man jailed for ‘disturbing’ child sexual abuse material

Man jailed for ‘disturbing’ child sexual abuse material

Up to 26,000 NZers’ devices infected with malware Lumma Stealer

Up to 26,000 NZers’ devices infected with malware Lumma Stealer

‘Just a disaster’: Dream fishing trip for friends ends in nightmare

‘Just a disaster’: Dream fishing trip for friends ends in nightmare

Editors Picks
As Bulgaria joins the euro, how do the other 20 member states see the currency?

As Bulgaria joins the euro, how do the other 20 member states see the currency?

January 10, 2026
Repair and reuse: inside Europe’s refurbished tech market

Repair and reuse: inside Europe’s refurbished tech market

January 10, 2026
EU rejects violence against protesters in Iran, backs ‘legitimate aspiration’ for change

EU rejects violence against protesters in Iran, backs ‘legitimate aspiration’ for change

January 10, 2026
EU member states back Mercosur deal, French MEPs vow fight in Parliament

EU member states back Mercosur deal, French MEPs vow fight in Parliament

January 10, 2026
Latest News
Mercosur: How Macron’s domestic weakness undercut his Brussels clout

Mercosur: How Macron’s domestic weakness undercut his Brussels clout

January 10, 2026
As Bulgaria joins the euro, how do the other 20 member states see the currency?

As Bulgaria joins the euro, how do the other 20 member states see the currency?

January 10, 2026
Repair and reuse: inside Europe’s refurbished tech market

Repair and reuse: inside Europe’s refurbished tech market

January 10, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Times Network New Zealand. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.